Ubratj okno master aktivacii microsoft office. Emergency $249 / yr 1 Website Initial Response Time within 4 hrs. Malware clean-up and hacking recovery plans. An all-in-one web-based platform for Malware & Security Monitoring, Hacking Remediation, Website Protection and other critical services for a safe and trusted website. Manual Malware Removal / Full Website Audit Blacklisting removal Web Application Firewall (WAF) Dedicated Malware Analyst 24/7 Access to Cybersecurity Professionals Economy $149 / yr 1 Website Initial Response Time within 12 hrs.

Drivers ovislink 80211g wireless lan pci card Installation & Commissioning of BTS Equipment Scope of work: • Receipt of site information from customer along with TND/RND • RFI check along with ensuring the site permissions • Material reception at the sites and checking as per packing list.

Bts Installation Manual Man ual And Commissioning Commissioning Alcatel Bts Installation And Ericsson Bts Commissioning Guide If you wish a book called Ericsson bts. RBS2111 Hardware Installation Technology Video The Radio Radi o Base Station 2000 (RBS 2000) is Ericsson's Ericsson's second generation generation of RBS, developed to meet. Alcatel BTS Discription - Download as PDF File (.pdf), Text File (.txt) or read online. BTS Terminal Installation & BTS Software Download (OFF-Line Commissioning) BTS Document. Documentos similares a Alcatel BTS Discription.

Alcatel

Bts commissioning (alcatel lucent) • 1. Switch OFF the BTS cabinet and disconnect Abis connectors fromDDF before offline start • Disconnect the Abis connectorfrom The DDF • Switch ON the BTS cabinet breakers and connect the Laptop with BTS • User Name “COMMTE” Password“COMMTE” • Communication Port setting • OR • After connecting this windowwill be appear • Go toConfiguration-> BTS-SW Download-> to download BTS software • After BTS- SW downloadthis window will appear • Go to offlineFiles and select First File of Master File.

• Go to offlineFiles and select First File of DDL file. • Click ok to startdownloading SW • BTS software starts to download. • All these Files aredownloaded • Go toConfiguration BTScommissioning • Click startcommissioning • Edit Qmux Address • Edit sector Mapping • Check AllTwin TRE’s. • Click EndCommissioning Click > Hardware setting>>BeginHW modification • Go to configuration> BTS commissioning Go to start commissioning> Edit Q1Address, Edit SectorMapping and Twin TRA setting as in offline. • Go toconfiguration> Hardware setting>“EndModification” to end onlinecommissioning • Online commissioning steps Connect the Abis connector at DDF by verifying Tx/Rx cable properly. OML will be established after primary Abis has connected to DDF. Give hard reset to BTS after OML has established. Put site on Downloading from OMC. O&M will be established as downloading completes. Connect Laptop to BTS MMI port. Go to configuration>Hardware setting>Begin Hardware modification. • Online commissioning steps Go to configuration>BTS commissioning>start commissioning. Edit Qmux Address Edit sector mapping Check all Twin TRA setting. Click end commissioning and shift all modules from selected modules to available modules. Go to configuration>Hardware setting>End Hardware modification. Click “yes” when an automatically hardware modification window appears. Hw Audit will be run and all Hardware will be shown after sometime.

• ON Line Commissioning Completed Successfully. • Software components combiner Fan UnitHardwareShown insoftware window Tre’s clock Alarm card • Alarmswindow • Transceivers Shown in window • Transceivers Types Four type of Transceivers in Alcatel Equipment TRAGE>Gsm Single TRE TRADE>Dcs single TRE TGT09>Gsm Twin TRE TGT18>DCS Twin TRE TAGHE>High power TRE • VSWRShown in window • Sectors ShownIn window • Station units • BSC SBLs(security block levels)BTS OM & Sectors.Sec RSLs can be unlock from local Terminal. • Troubleshooting If a TRE or combiner is in “Not Operational” or “FOS” state then disable it then initialize it by using “init” command. If TRE or combiner can not operational by doing above command then remove it by using the following method. Go to configuration>>Hardware setting>>Begin HW modification. Go to Configuration>>Hardware setting>>Remove. Remove the Hardware from BTS. Window will be appear of Hardware removal, select the module to remove. Go to Configuration>>Hardware setting>>End Modification. Click ”yes” when configuration changes window appears. • HardwareRemoval Method Step:1 • HardwareRemoval Step:2 • HardwareRemoval Step:3 • Troubleshooting cont. When a module goes in “FOS” state then it must be disable by using ”disable” command before initializing it by using “init” command otherwise it will not goes to operational state. When a module is in “Not Operational” state with color white then it means it has not got it’s RSL number still. Reload BTS data by going to “configuration>Reload Bts data” or using a method of “Begin Hardware then End Hardware” as discussed earlier.