Ubratj okno master aktivacii microsoft office. Emergency $249 / yr 1 Website Initial Response Time within 4 hrs. Malware clean-up and hacking recovery plans. An all-in-one web-based platform for Malware & Security Monitoring, Hacking Remediation, Website Protection and other critical services for a safe and trusted website. Manual Malware Removal / Full Website Audit Blacklisting removal Web Application Firewall (WAF) Dedicated Malware Analyst 24/7 Access to Cybersecurity Professionals Economy $149 / yr 1 Website Initial Response Time within 12 hrs.
Installation & Commissioning of BTS Equipment Scope of work: • Receipt of site information from customer along with TND/RND • RFI check along with ensuring the site permissions • Material reception at the sites and checking as per packing list.
Bts Installation Manual Man ual And Commissioning Commissioning Alcatel Bts Installation And Ericsson Bts Commissioning Guide If you wish a book called Ericsson bts. RBS2111 Hardware Installation Technology Video The Radio Radi o Base Station 2000 (RBS 2000) is Ericsson's Ericsson's second generation generation of RBS, developed to meet. Alcatel BTS Discription - Download as PDF File (.pdf), Text File (.txt) or read online. BTS Terminal Installation & BTS Software Download (OFF-Line Commissioning) BTS Document. Documentos similares a Alcatel BTS Discription.
Bts commissioning (alcatel lucent) • 1. Switch OFF the BTS cabinet and disconnect Abis connectors fromDDF before offline start • Disconnect the Abis connectorfrom The DDF • Switch ON the BTS cabinet breakers and connect the Laptop with BTS • User Name “COMMTE” Password“COMMTE” • Communication Port setting • OR • After connecting this windowwill be appear • Go toConfiguration-> BTS-SW Download-> to download BTS software • After BTS- SW downloadthis window will appear • Go to offlineFiles and select First File of Master File.
• Go to offlineFiles and select First File of DDL file. • Click ok to startdownloading SW • BTS software starts to download. • All these Files aredownloaded • Go toConfiguration BTScommissioning • Click startcommissioning • Edit Qmux Address • Edit sector Mapping • Check AllTwin TRE’s. • Click EndCommissioning Click > Hardware setting>>BeginHW modification • Go to configuration> BTS commissioning Go to start commissioning> Edit Q1Address, Edit SectorMapping and Twin TRA setting as in offline. • Go toconfiguration> Hardware setting>“EndModification” to end onlinecommissioning • Online commissioning steps Connect the Abis connector at DDF by verifying Tx/Rx cable properly. OML will be established after primary Abis has connected to DDF. Give hard reset to BTS after OML has established. Put site on Downloading from OMC. O&M will be established as downloading completes. Connect Laptop to BTS MMI port. Go to configuration>Hardware setting>Begin Hardware modification. • Online commissioning steps Go to configuration>BTS commissioning>start commissioning. Edit Qmux Address Edit sector mapping Check all Twin TRA setting. Click end commissioning and shift all modules from selected modules to available modules. Go to configuration>Hardware setting>End Hardware modification. Click “yes” when an automatically hardware modification window appears. Hw Audit will be run and all Hardware will be shown after sometime.
• ON Line Commissioning Completed Successfully. • Software components combiner Fan UnitHardwareShown insoftware window Tre’s clock Alarm card • Alarmswindow • Transceivers Shown in window • Transceivers Types Four type of Transceivers in Alcatel Equipment TRAGE>Gsm Single TRE TRADE>Dcs single TRE TGT09>Gsm Twin TRE TGT18>DCS Twin TRE TAGHE>High power TRE • VSWRShown in window • Sectors ShownIn window • Station units • BSC SBLs(security block levels)BTS OM & Sectors.Sec RSLs can be unlock from local Terminal. • Troubleshooting If a TRE or combiner is in “Not Operational” or “FOS” state then disable it then initialize it by using “init” command. If TRE or combiner can not operational by doing above command then remove it by using the following method. Go to configuration>>Hardware setting>>Begin HW modification. Go to Configuration>>Hardware setting>>Remove. Remove the Hardware from BTS. Window will be appear of Hardware removal, select the module to remove. Go to Configuration>>Hardware setting>>End Modification. Click ”yes” when configuration changes window appears. • HardwareRemoval Method Step:1 • HardwareRemoval Step:2 • HardwareRemoval Step:3 • Troubleshooting cont. When a module goes in “FOS” state then it must be disable by using ”disable” command before initializing it by using “init” command otherwise it will not goes to operational state. When a module is in “Not Operational” state with color white then it means it has not got it’s RSL number still. Reload BTS data by going to “configuration>Reload Bts data” or using a method of “Begin Hardware then End Hardware” as discussed earlier.